Six key points of using pulverizer in organic fertilizer production equipment

2022/05/11
In the organic fertilizer production equipment, the crusher is often used for bio organic fermentation composting, which is a special crushing equipment for urban garbage and rural straw garbage. In order to achieve the effect of safe implementation and save the operation cost, the maintenance of organic fertilizer pulverizer should be carried out in daily use, which can extend the service life of crushing equipment.

The following is a brief introduction to the main points of the application of the pulverizer in the organic fertilizer production equipment:

1. The wet material crusher and power unit of organic fertilizer equipment shall be installed firmly. If the crusher is fixed for a long time, it shall be fixed on the cement foundation. If the crusher is in flow operation, the unit shall be installed on the base made of angle iron, and the belt pulley groove of the coal gangue crusher of the power machine (diesel engine or motor) shall be in the same rotating plane.

2. After the installation of organic fertilizer production equipment, the fastening of fasteners of each part shall be checked. If the parts of NPK fertilizer granulator are loose, tighten them. At the same time, check whether the belt tightness is appropriate.

3. Before starting the organic fertilizer wet material grinder, turn the rotor by hand to check whether the claws, hammers and the rotor are running flexibly and reliably, whether there is any collision in the shell, and whether the rotation direction of the rotor is consistent with the direction pointed by the arrow of the machine. , Whether the lubrication of the power machine and coal gangue grinder is good.


4. Don't change the belt pulley casually, in case the speed is too high to cause explosion in the crushing chamber, or the speed is too low to affect the working efficiency of the coal gangue crusher.

5. Pay attention to the operation of the wet material crusher at all times during work, and the feeding should be even to prevent blocking the stuffy car, and do not overload the work for a long time.

6. The wet material crusher of organic fertilizer production equipment shall be idled for 2-3min after starting, and then feed after no abnormal phenomenon. The crushed materials enter the fertilizer granulator.